Project Aviation Cosmetics Malta

In February 2016 GS Staalwerken has started the installation of a steel double airplane hangar at the airport in Malta. Principal Aviation Cosmetics Malta ltd.

The entire construction is carried out in a unique partnership with construction company L. van de Ven B.V. and Van Berlo Bedrijfsvloeren B.V. called VSB B.V.

In these hangars aircraft will be equipped with a new paint job. Aviation Cosmetics Malta ltd. has over 20 years experience and was previously located at the airport in Eindhoven.

Total installation time: approximately 14 weeks, which is still about 10 weeks remaining. Total weight: approximately 900 tonnes